The "hooks" on the outside of the theater walls now have their use defined: they hold the insulation against which the bricks are being laid. The men have been working, too, on the back entrance/stairwell. A close look at the photo reveal the steps inside the door. The second view of this area is from the 4th. floor. The floor of the elevated seating area is just about finished; one more level of concrete must be laid. The stage front awaits its final concrete installment. Work continues on the prop room as seen from the SW corner. The foundation of the gym annex is just about finished and ready for concrete blocks. Busy, busy, busy!
Monday, September 29, 2008
Busy, Busy, Busy!
The "hooks" on the outside of the theater walls now have their use defined: they hold the insulation against which the bricks are being laid. The men have been working, too, on the back entrance/stairwell. A close look at the photo reveal the steps inside the door. The second view of this area is from the 4th. floor. The floor of the elevated seating area is just about finished; one more level of concrete must be laid. The stage front awaits its final concrete installment. Work continues on the prop room as seen from the SW corner. The foundation of the gym annex is just about finished and ready for concrete blocks. Busy, busy, busy!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment