Things look worse before they start looking a thousand times better. Excavation has begun for the lower seats and the orchestra pit in the theater, making this area harder to negotiate for the workers. The interior of the theater is somewhat in shadow much of the day as the season progresses and since the walls have reached their intended height. The wall of the main building that is shared with the lobby of the theater is being given a covering of concrete blocks, as can be seen in one photo above--another intriguing fact. It has been interesting to see how each of the main walls of the theater are finished off at the top. Each hints of steel beams to come, but each in a different way.
The steps leading from the ground floor of the main building to the lobby of the theater and to the hallway to the stage area are visible in another photo. Lots of heres and theres to watch, some obvious and others full of mystery to the lay observer, such as this blogger. To blog (in this capacity) is to learn.
No comments:
Post a Comment