Friday, September 26, 2008

Always Something New To Behold





What's going on in front of the gym? The annex is beginning to unfold with the laying of the foundation! What's up in the theater site? More concrete is laid in the elevated seating area while the stage foundation is set for construction. (This is probably what the blogger/photographer misguessed as the excavation for the lower seats and the orchestra pit the other day. Humility advances ((maybe))).
On the outside surface of the total site, some of the new pavement leading to the theater loading dock (maybe) is laid. What are those red lines on the parking lot? More rain garden areas are coming! What's that red water tank truck doing on the campus again? The soccer field receives a much needed watering to preserve the grass growth that has taken place there. The geese? No sign of them for almost two weeks. No predictions on that front!

No comments: