Thursday, October 2, 2008

Commencement Of Month Eight







October 1: The theater's outside walls really outline the whole structure now with perhaps the entrance needing defining yet. The blogger has descended the steps shown for the first time and finds them very substantial. These are the steps that go from the foyer and adjacent hall to the ground floor of the main building. You've seen them from the other end already. While everything else on the inside seems to remain pretty much the same, the highest level of the elevated seats is still gray and drying out. The wall between the foyer and the theater proper hasn't begun its ascent yet.

A little excitement on the outside was the result of an elevated water pipe being struck, the consequence of which is the geyser you see (just in case you thought it was a feature of the garden that will grace the front of the theater--sorry). Picking things up and carting them off is, of course, made easier with a crane. The rods being thus disposed of are from the gym annex area. These are some of the scenes of today with the grand finale in the heavens: the sunset is beautiful--honest!

No comments: