The week’s work in the theater is obvious. The work on the walls and side areas of the theater proper get finishing touches and the floor is readied, then partially dug out. The large opening in the west wall is coming close to the end of its usefulness as vehicles pass in and out, finishing various tasks. More concrete is poured on the sides of the seating area, and will be poured soon in the center. Notice in the photo in which you are looking through the door on the east side, the one from the hallway, two men who are moving something that is not visible due to a lack of contrast with the background. What they are moving is a large piece of wire screening that will be placed at the bottom of an area ready for concrete. In one photo you may notice the west wall being painted, and in another, the wall painting completed.
Perhaps the annex is more exciting though less seems to be happening there. Blue flooring is completed and finishing touches of paint are applied to small areas such as around crash bars and door handles. Supplies are cubbied suggesting that areas are being cleared in order to be completed. The strength training/phys ed room, still showing its concrete floor, will be made of a different material which should come this next week. In fact, the annex is projected to be finished by the end of February. Now that’s cause for celebration, at least by the phys ed students who like to peak around corners at their new classroom.
The other development may seem less exciting now, but will be very welcome when the warm weather comes and the new A C unit outside the faculty room brings cool air into the kitchen, cafeteria, and auditorium. Ahhh. More celebration! N.B. Look below for more photos.
No comments:
Post a Comment