The annex is finished except for the cork floor in the strength training room. Since some of what is required by law (federal) revolves around handicap access, the lavatories, showers, and a few other things needed to be extra roomy and/or with very handy knobs, handles, etc., even though one must stretch the imagination a bit to come up with practical reasons for compliance in a gym annex. The water heater provides hot water for showers and sinks. Notice that the lockers have been raised a bit. What are pictured are in the coaches’ locker room. The photos are here for the record.
Wednesday, February 25, 2009
Federal Finishes
The annex is finished except for the cork floor in the strength training room. Since some of what is required by law (federal) revolves around handicap access, the lavatories, showers, and a few other things needed to be extra roomy and/or with very handy knobs, handles, etc., even though one must stretch the imagination a bit to come up with practical reasons for compliance in a gym annex. The water heater provides hot water for showers and sinks. Notice that the lockers have been raised a bit. What are pictured are in the coaches’ locker room. The photos are here for the record.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment