Wednesday, February 25, 2009

Theater Times cont.





While a workman is on stilts in the basement area hanging the metal framework for a lowered ceiling, men in the body of the theater work to ready sections of the floor for concrete, or do finishing touches to what has just been laid. The green plastic sheeting over the wire grid tells us that fresh concrete is not far away. In one photo you can find out how the orchestra members get down into their domain. Checking on the basement hallway a little later reveals the hung gridding with ceiling tiles not far away. The theater has a few months to go before being finished, but May is not too far away!

No comments: