Heavy weekend in many meanings of the words. The plateau on the hill keeps getting smaller in area as the excavator nibbles away at the sides, the dirt going to the soccer site. This in turn keeps rising as the photo of the compactor taken from the driveway demonstrates.
On the area of the soon to be parking lot, a dozer gets stuck, is extricated, and relieved of a broken tread (2 photos). Drama abounds.
On the theater site a curved wall appears with all its rods sticking up, waiting to be added to. (You may be able to detect the curve, right center, if you enlarge the photo.) Coming indoors and not very far—one wall away—from the theater site is the room mentioned in the last blog, now revealing its new connection. It opens into the gym storage room via stairs. Old stage loses; gym storage gains. The new stage will, of course, have a new storage area for flats and scenery. The old gives way to the new. All this has been accomplished over the weekend, with men working Saturday and Sunday.
No comments:
Post a Comment