Hard Work: That's What It's All About






Very busy week! Activity on all fronts as the workmen take as their goal our goal of getting the place ready for the start of school on the 20th.. This calls for a big cleanup on the parking lot, patching of damaged areas of asphalt, completion of all necessary trench work and all work requiring the moving of heavy equipment across the parking lot and drive. Of course, like every other task in this whole project, the redoing of areas of asphalt is a multilayered one, both literally and figuratively. The photo shows what looks like wet gravel in the area to be blacktopped. The asphalt follows, but not yet.
At least one more trench on the front side of the building is required; there may still be more that we do not foresee. But then, who of us forsaw most of such endeavors? The trench in the photo is for electric wiring going back to the theater site.
And the theater site is seeing its own marvels unfold as more concrete blocks are laid and the foyer area is given a concrete floor. Now that's Progress! (Some technical difficulties prevent blogger from posting photos. It will be Progress when she works the difficulty out!)

No comments: