Finishing touches and major steps toward the finished line are appearing on all sides. Sanding the floor to ready it for the cork tile in the strength training room in the annex is matched by the use of the electric trowel on the last-laid section of the theater floor. The area will be measured for the seats placement next. Meanwhile, the “large opening” is becoming smaller and smaller: first the base blocks, then the building upward, leaving a much darker interior to the theater. The lobby will have light, we know, since the light fixtures are being installed there.