Tuesday, January 27, 2009

If Motion Produces Heat...





…the construction site is a hot spot. In today’s photos you’ll see lots of motion or results thereof. Starting outside the faculty room (1996 addition) we see a mysterious slight plateau that surely has something to do with utilities (no word on exactly what yet). Over at the gym annex we see a man on a ladder in the strength training classroom working on something in the ceiling. Note that the framework for the ceiling tiles is in place now. Moving outside the same room, we note the large window in that room has a frame now. Glass can’t be far away!
Over in the theater men are installing ceiling panels on the sides of the theater proper and hanging more drywall. Above the highest seats toward the back, a man enters the sound room in the only available way other than the catwalk. The catwalk near the stage is another area of today’s labor. The back wall of the stage is painted now, and readers will recall that the paint has been sprayed on by painters wearing masks. Evidence abounds in precautions for safety. That is a relief. Prayers rise frequently for the safety as well as the thoroughness of the workers. And the people pray, Amen! Finally, as we walk down the steps that lead to the ground floor of the main building, we walk past the outside door and see a workman getting ready to put a second crash bar on the door. This door, one guesses, will not have access from the outside—a safety feature for the inhabitants. Again, Amen. (See below for the rest of today's photos.)

1 comment:

Anonymous said...

Construction Recruiting and Trade Staffing with Grus can save your bottom line in this tough economy.
Grus Construction Personnel also has nice construction jobs for tradesmen.